News

Published November 20, 2023

India tunnel workers may be trapped for another four or five days

Rescue workers have shifted to an attempt to dig toward them vertically
India tunnel workers may be trapped for another four or five days

Rescuers blocked from reaching 41 trapped construction workers shifted Monday to an attempt to dig toward them vertically after the nine−day effort in mountainous northern India has been stymied by debris and technical glitches.

The trapped workers are healthy and receiving food like nuts, roasted chickpeas and popcorn through a pipe, Deepa Gaur, a government spokesperson, said. Oxygen was being supplied to them through a separate pipe, she said.

The rescuers are creating an access road to the top of the hill, from where the vertical drilling is to start Monday evening, said Devendra Patwal, a disaster management official overseeing the rescue efforts at the site in Uttarakhand state.

From the vertical direction, drilling to the tunnel will take a few days and debris could fall during the digging, Patwal said.

The workers have been trapped since Nov. 12, when a landslide caused a portion of the 4.5−kilometre (2.8−mile) tunnel they were building to collapse about 200 metres (650 feet) from the entrance.

Uttarakhand is dotted with Hindu temples, and highway and building construction has been constant to accommodate the influx of pilgrims and tourists. The tunnel is part of the Chardham all−weather road, a flagship federal project connecting various Hindu pilgrimage sites.

About 200 disaster relief personnel have been at the site using drilling equipment and excavators in the rescue operation.

The horizontal drilling effort involved a machine breaking through rocks and debris to create a space to insert pipes through which the trapped workers could crawl out, but it was halted after the machine was damaged. The machine’s high−intensity vibrations also caused more debris to fall.

Drilling vertically from the top of the hill could also cause debris, but officials said they would use a technique designed for unstable ground.

The rescuers will need to dig 103 metres (338 feet) to reach the trapped workers — nearly double than if they carried on digging from the front.

Officials said the efforts to reach the workers from the horizontal tunnel would continue.

banner image: The Associated Press

What do you think of this article?
+1
0
+1
0
+1
0
+1
0
+1
0
+1
0
Advertisement
Advertisement
Advertisement

Have a breaking story?

Share it with us!
Share Your Story

What Barrie's talking about!

From breaking news to the best slice of pizza in town! Get everything Barrie’s talking about delivered right to your inbox every day. Don’t worry, we won’t spam you. We promise :)
Subscription Form
Consent Info

By submitting this form, you are consenting to receive marketing emails from: Central Ontario Broadcasting, 431 Huronia Rd, Barrie, Ontario, CA, https://www.cobroadcasting.com. You can revoke your consent to receive emails at any time by using the SafeUnsubscribe® link, found at the bottom of every email. Emails are serviced by Constant Contact

Related Stories

Advertisement
Advertisement